9/27/11

Caroline Cook

Wooden ramps are being used near the L-B-J Student Center. The ramps are necessary while construction crews repair damages caused recently by a major leak at the center. The temporary ramps have been set up between the student center and the McCoy Business Building. Construction workers are repairing the damage. Cement is being replaced and new drains are being installed.

No comments:

Post a Comment