3/27/14

Audrey Seifert

After a year of construction at a cost of three-point-five (M) million dollars, Old Main finally has the facelift it desperately needed. But what looks beautiful on the outside isfalling apart inside. Staircases are being blocked off, plaster is falling off the walls, and cracks are apparent in the floors, walls, and ceiling. The School of Journalism and Mass Communication is up for reaccreditation this year,so plans are being made to repair the building's inside as well.

No comments:

Post a Comment